COMPLETED

COMPLETED

The Second Ring Road Project (with Umm Alqurra Road)

The Second Ring Road Project (with Umm Alqurra Road)

The Second Ring Road Project (with Umm Alqurra Road)

Overview

The Second Ring Road Project (with Umm Alqurra Road) MBS in Makkah Al-Mukarramah, 900m away from the Holy Mosque

Traffic & Pedestrian Management Excellence:

ENJAZCO's expertise in traffic and pedestrian control ensures safe, efficient movement in high-density areas near the Holy Mosque (900m away).

Optimized Flow & Congestion Reduction:
  • 50% reduction in peak congestion for vehicles & pedestrians

  • Seamless daily traffic flow with strict safety measures

  • multi-zone control & real-time monitoring for adaptive management

  • Zero-Accident Safety Record: Achieved through strict protocols, risk management,

  • and coordinated control.

  • Expert-Led Operations: Certified engineers & safety officers ensuring compliance and efficiency.
    Proven Efficiency Gains:

  • 45% reduction in vehicular delays

  • Optimized pedestrian movement, preventing overcrowding

  • 122 Outstanding Client Recognition: Consistently praised for safety, efficiency, and excellence in com-

  • plex traffic environments beyond traditional highway projects.

Other Info

Project


COMPLETED

Get in touch for more about this Project

10+ Featured Agents

5 / 5

10+ Featured Agents

5 / 5

Building isn’t just a job. At Enjaz Construction Co. it is our passion. With every project we undertake, we set the bar high and provide the best people in the industry, with a true love of what we do to make our Customers’ vision a reality.

Social Media

All Right Reserved For EnjazCo © 2025

Building isn’t just a job. At Enjaz Construction Co. it is our passion. With every project we undertake, we set the bar high and provide the best people in the industry, with a true love of what we do to make our Customers’ vision a reality.

Social Media

All Right Reserved For EnjazCo © 2025